Toto TBN01101U Manual De Instalación Y Del Propietario página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

II. Installation of Valve
1. Remove the inner plaster guard
before installing the valve.
2. Use self-tapping screws below
Ø0.2" (Ø5mm) diameter to
secure main body part to the
wall. The valve needs to be
perpendicular to the wall
surface.
1.6" (41mm)
Outer plaster guard
Inner plaster guard
Self-tapping screw
(Available in market)
3. After installing the valve, verify
the connector color mark is
facing "up", then install the
inner plaster guard onto the
valve. The flat part of the inner
plaster guard should align with
the flat part of the connector.
4. After installation, open the
shut-off valve. Rotate the inner
plaster guard to confirm the
water outlet direction as
shown in the figure.
INSTALLATION PROCEDURE
Self-tapping screw of
fixing valve body
2.2"
(55mm)
Rotate the
self-tapping screw
to go through the
outer plaster
TBN01101*or
TBN01102*or
TBN01103*
TBN01104*
Connector
Connector flat
part
TBN01102*
Water outlet 2
Water outlet 1
TBN01101* / TBN01103*
Water outlet 2
Water outlet 1
5
Back
Handheld
shower
Right
side
Color mark
TBN01104*
Close
Open
Water outlet 3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tbn01103uTbn01102uTbn01104u

Tabla de contenido