Standard Tank(CONVENTIONAL TYPE) Connection
From step 1 to 3 is the same as Pre-Charge Tank Connection from step 1-3 .
Step 5 is the same as Pre-Charge Tank Connection step 6a.
PUMP ELECTRICAL CONNECTIONS
WARNING: It is recommended all electrical work be performed by a licensed electrician.
WARNING: When wiring from the power source to the pressure switch, it is recommended that you use either a 14-
gauge or 12-gauge cord.
WARNING: Before wiring the pressure switch, turn off the power source to which you are connecting to avoid
potentially life threatening electrical shock.
For Professional Technical Support call 1-844-242-2475
4. Cement 3/4in.PVC rigid Pipe into 3/4in. PVC 90-Degress
S×S Elbow. Cement 3/4in. PVC MPT×S Male Adapter into
3/4in.PVC rigid Pipe that connect with a 3/4in. PVC FPT×FPT
Union .(Fig. 4)
6. Completed installation with piping and tank is shown (Fig.
6)
7. Install a tee, the reducing bushings and the barbed fitting in
the suction line. (Please see page 10~11), well to pump
connection for standard tank connection). Install the AVC
tube between the barbed fitting and the port on AVC (which is
mounted on the tank)
13