Technical Data - DITEC UP8 Manual De Instalación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20

1. TECHNICAL DATA

Power supply
Motor power supply
Absorption
Torque
Capacitor
Opening time
Rod lenght (max)
Service class
Intermittence
Degree of protection
Temperature
Weight
Control Panel
2.
REFERENCE TO ILLUSTRATIONS AND AC-
CESSORIES
The given operating and performance features can only be
guaranteed with the use of DITEC accessories and safety
devices.
2.1 Standard installation references (fi g. 1)
[1]
Radio
[2]
Flashing light
[3]
Key selector
[4]
Connect the power supply to an omnipolar switch with
contact opening distance of at least 3 mm (not supplied
by us) or by means of power plug.
Connection to supply mains must be carried out in an
independent raceway separate from control connections
and safety device connections.
[5]
Barrier
[6]
Photocells
2.2 Barrier references (fi g. 2)
[7]
Container
[8]
Geared motor
[9]
Key release
[10] Fixing base
[11] Rod bearing fl ange
[12] Limit switch group
[13] Control panel
[14] Springs
[15] Transmission lever
[16] Lever arm
[17] Top spring attachment
[18] Spring tightener
[19] Internal mechanical lock
2.3 Accessories
UP8B
Aluminium round arm 4200 mm
UP8M
Red spring Ø 7
UP8G
Joint for round arm
UPC
Set of 10 red refl ectors
UPAF
Fixed bearing
UPAM
Mobile bearing
UPGR
Aluminium fence L=2000 mm
3.
INSTALLATION
Unless otherwise specifi ed, all measurements are expressed
.
in millimetres (mm)
UP8E
230 V~ / 50 Hz
230 V~
1,5 A
160 Nm
12,5 µF
5÷8 s/90°
8400 mm
4 - INTENSIVE
S2 = 30 min, S3 = 50%
IP45
-20° C / +55° C
90 kg
E1A
3.1 Barrier installation
-
Lay a concrete foundation with buried anchoring brackets
and the base plate, making sure that it is perfectly level and
smooth. Insert appropriate elements in iron or any other
suitable material into the holes of the anchoring hooks so
as to permit fi xing to the concrete reinforcement. (Fig. 3)
Route the cable ducts through the central hole of the plate.
Attention: ensure that anchoring is sturdy and stable.
-
Fasten the group.
3.2 Reversal of the direction of the rod
The UP8 barriers are normally supplied in the right-hand version.
By right barrier we mean that the container is assembled on the
right, as seen from the side that can be inspected. To transform
the barrier from right to left:
-
(Fig. 8) Disassemble the spring fi xing parts [17].
-
Rotate the lever arm 90° [16].
-
To reassemble the particular ones of springs [17], [18] and
the springs [14] to left (the upper spring [17] coupling and
the transmission lever [15] have one screw in common).
-
(Fig. 10) Position the DIP2 of the control panel on ON.
3.3 Arm installation
-
Bring the rod bearing fl ange [11] to a vertical position. Lock
the geared motor (see operating instruction).
-
(Fig. 7) Hook on the springs by means of the spring tighte-
ner [18].
-
(Fig. 4) Install and secure the rod.
-
Release the geared motor and position the rod horizontally.
Attention: the rod is not secured nor balanced.
-
Assemble any accessories (sensitive rubber profi le, fence,
mobile bearing, etc).
3.4 Spring balancing
Check for suitable springs as it is shown in table.
The barrier is supplied complete with two springs: a green spring
in Ø6 and a red spring in Ø7.
If the high, and therefore heavier, sensitive edge is used, refer
to UPGR apron column for spring choice.
If the UPAM mobile support is added, spring choice does not
change.
Tighten springs by means of the proper tie rod [18] and with
boom arm in a vertical position.
Unlock motor.
After spring tightening, place rod arm at approximately 45° (all
accessories included) and make sure it is well fi xed.
Make also sure that, in closing and opening fi nal positions, the
9
GB
UP8 - IP1782

Publicidad

Tabla de contenido
loading

Tabla de contenido