Installation Instructions; Recommended Tools - Niagara ECOLOGIC 1.6 GPF Instrucciones De Instalación, Guía Para La Solución De Problemas Y Garantía

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS

To insure proper installation carefully read these instructions and be sure you have the
proper tools to complete the job. Vitreous china plumbing products are heavy and fragile. To
avoid injury or damage, ask for assistance and handle with extreme care. During installation,
make sure the plumbing system is vented adequately and that the soil pipe is clean.
Be very cautious when working with vitreous china plumbing products. Vitreous china can
break and chip if you overtighten mounting bolts or nuts. Such breaks and chips are as
sharp as glass and should be handled with care. Take care when handling these products.
1.
TURN OFF THE MAIN WATER SUPPLY.
2.
3.
4.
5.
Install new "T" bolts with elongated brass flat washers and thin brass hex-
head (jam) nuts.
Remove the toilet from the box and set the toilet upside down on a soft
surface. (You may use the box for this purpose.) Set the wax ring firmly in
place around the outlet of the toilet.
Carefully lower the toilet bowl onto the floor flange while aligning the "T"
bolts through the two holes in the toilet bowl foot.
Make sure that the toilet bowl is level. If the toilet tilts or is rocking, insert
shims under the base.

RECOMMENDED TOOLS:

• 1/2˝ x 9/16˝ Box or Open-End Wrench
• Adjustable Wrench
• Caulking
• Hacksaw
• Level
• Putty knife
• Screwdriver
• Tape Measure

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ecologic 1.28 gpf

Tabla de contenido