Kohler STERLING 6104 Serie Guia De Instalacion página 10

Ocultar thumbs Ver también para STERLING 6104 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

End Wall
Back Wall
6. Prefit the Wall Surrounds
Place the back wall on the bath.
Temporarily install a roofing nail or equivalent over the top of the nail flange into the center of a
stud. Do not drive the nail in so far that it interferes with the remaining wall.
Position both end walls ensuring that the wall interlock pins are engaged.
Do not secure the walls to the stud framing at this time.
Verify that the assembled wall surround is resting properly on the bath. If required, remove the
roofing nail at the back wall.
Verify that the end walls are flush with the edge of the bath. If required, push or pull the end walls
into position.
While assembled, check fit and verify that the surround walls are properly aligned with the studs at
the upper and vertical nailing flanges.
If required, add shims to bring the studs into contact with the wall surround.
1020583-2-D
End Wall
Base Rim
Bath
Roofing Nail
Back Wall
Nailing Flange
Backwall Clip
10
Back Wall
Interlock Slot
End Wall
Bath
End Wall
Pin
Sterling

Publicidad

Tabla de contenido
loading

Tabla de contenido