Attaching the Wall-Mount
Bracket to the Dry Wall with Studs
WM4
WM1
Installing the Lateral Shift
Bracket to the Wall
1
Decide on the installation
location.
Make sure that the wall has enough space
for the TV and is capable of supporting a
weight of at least six times that of the TV.
• Refer "Measurement for Lateral Shift
Bracket installation on the wall" on page
19.
• Refer to your TV's Reference Guide for the
TV's weight.
Note
When your TV is installed on the wall, the upper
side of the TV slightly leans forward.
We recommend you to check the position of TV in
the viewing environment.
2
3
Align
WM4
four marks aligned with the
studs.
× 4
Note
Use a level to check whether
4
Drill upper pilot holes on the
marks.
Note
Pilot holes must be drilled to a depth of 75 mm
(3 inch), using a 5.5 mm (7/32 inch) diameter drill
bit.
− 8 (US) −
to the wall and make
WM4
WM4
is level.
× 2
5.5 mm
(7/32 inch)
75 mm
Stud or
(3 inch)
Reinforcement