MTD 200 Serie Manual Del Operador página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

LOWER CHUTE ROTATION CONTROL
1. Remove the hex lock nut (a) and machine screw (b) from the
chute rotation control assembly (Figure 14, Inset A).
A
a
b
Figure 14
2. Place the chute rotation control assembly onto the chute
rotation rod, align the holes and secure with the hex lock nut
(a) and machine screw (b) (Figure 14, Inset B).
Continue to Set-Up (page 9).
Set-Up
INSTALLING THE RECOIL STARTER HANDLE ONTO THE
UPPER HANDLE
1. Remove the eye bolt and handle knob from the manual bag.
2. Place the eye bolt (a) and handle knob (b) on the upper handle
(Figure 15, Inset A). Do not fully tighten the hardware until
instructed to do so.
A
b
a
Figure 15
NOTE: The opening of the eye bolt (a) should face toward the
back of the snow blower.
3. Slowly pull the recoil starter handle up towards the eye bolt
(a).
4. Slip the recoil starter rope into the eye bolt (a) from the back
of the snow blower (Figure 15, Inset B).
5. Securely tighten the eye bolt (a) and handle knob (b).
ASSEMBLY
a
b
STOP
B
INSTALLING THE DRIFT CUTTERS (IF EQUIPPED)
1. Remove the carriage bolts (a) and flange lock nuts (b) from
the drift cutters (Figure 16).
2. Install the drift cutters and secure with the carriage bolts (a)
and flange lock nuts (b) removed in Step 1.
B
a
Adding Fuel & Oil
Refer to the Engine Operator's Manual for information on adding
fuel and oil.
9
b
b
Figure 16
a

Publicidad

Tabla de contenido
loading

Tabla de contenido