Kohler Aquifer Reverse Osmosis Guia De Instalacion página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9. Installation Checkout
Turn on the cold water supply.
Check all connections for leaks. Repair as needed.
Run water through the faucet for at least 5 minutes to remove any air and carbon particles in the
system.
1395432-2-B
12
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido