Lorell LLR81954 Guia De Inicio Rapido página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTRUCTIONS TO INSTALL A TRACK ON THE ELECTRIC HEIGHT ADJUSTABLE WORKSTATION:
STEP 1: Place the front of the track 3 against the bottom of the worksurface 2 and the back of the track against the U-channel 1.
STEP 2: Align the holes in the track 3 with one of the sets of pilot holes in the U-channel 1 keeping the front of the track 1/8" to 5/8" from the front of
the worksurface 2. Place (2) washers 4 on (2) self-drilling screws 5. Drive them through the track and into the U-channel 1.
STEP 3: Attach the front of the track 3 to the worksurface 2 using (2) wood screws 6. Do not over-tighten the screws. Use a low torque setting on the drill.
STEP 4: Complete the track installation using the instructions that came with the product you are installing.
6
ITEM #
PART #
1
VARIES
LT U-CHANNEL
2
VARIES
LT WORKSURFACE
3
VARIES
TRACK ASSEMBLY
4
52236
3/16" ALUMINUM RIVET WASHER .198 x .510 x .067
5
52678
8-18 x 1/2 PHILLIPS PAN SELF DRILL SCREW
6
51708
M5 x 18MM SQ/PH/WSHR HEAD WOOD SCREW
5
4
3
DESCRIPTION
2
1
QTY.
1
1
1
2
2
2
PAGE 4 OF 4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Llr81955

Tabla de contenido