BATHTUB INSTALLATION (Continued)
3. Verify Bathtub Fit
Level
Verify straight
and square.
Top
flange
Side
flange
◘
Position bathtub as shown.
CAUTION:
Entire bottom support must be in contact
with a fl at, level surface.
TIP: If installation surface is not level, use leveling
compound or mortar bed for proper installation.
5. Attach Drain and Overflow
◘
Attach drain and overflow following manufacturer's
instructions.
CAUTION:
Plumber's putty will degrade bathtub
material. Do not use plumber's putty to seal between drain
and bathtub. Use latex/acrylic sealant or a gasket.
Top
flange
Side
flange
Square
Overflow
Drain/overflow
assembly sized
for 14-1/2" deep
bathtub
5
4. Prepare Bathtub
Top
flange
Mark stud
locations.
Top
flange
CAUTION:
Drill 3/16" clearance holes into fl anges only.
Do not drill 3/16" holes directly into studs. Drill chuck can
damage panel. Use an extended bit holder to reduce risk
of drill chuck hitting panels.
◘
Drill 3/16" holes at all stud locations on top flanges.
◘
Drill 3/16" holes along side flanges.
6. Apply Adhesive
3 1/2"
◘
Mark pencil lines on floor according to dimensions shown.
APPLY ADHESIVE
on fl oor using trowel, staying within
pencil line.
◘
Place bathtub on adhesive-covered floor.
23"
4 1/4"
Pencil line
P/N 27751 8/10
Top
flange
Side
flange