BATHTUB INSTALLATION (Continued)
7. Secure Bathtub
1-1/4" screws
(panhead or
roundhead)
Top
flange
TIP: Place drop cloth in bathtub and stand inside
bathtub to press it to fl oor when securing to wall studs.
◘
Secure flanges to wall studs with 1-1/4" screws.
CAUTION:
Use panhead or roundhead screws. Do not
overtighten screws, this can cause fl anges to crack.
IMPORTANT!
Gaps between fl anges and studs must be
less than 1/8". Insert shims to fi ll gaps.
Shim
Top
flange
Less than
1/8" gap
Side
flange
8. Apply Sealant
Finished wall
◘
If installing our matching wall set, proceed with "Wall Set
Installation" instructions.
CAUTION:
After installing fi nished walls, remember to
apply sealant to all outer edges.
APPLY SEALANT
to seal gap between bathtub and wall.
Follow manufacturer's instructions for
IMPORTANT!
sealant dry time before use.
6
P/N 27751 8/10