Glacier bay F1AA0005OB Guía De Instalación Y Cuidado página 9

Bañera y ducha conjunto
Ocultar thumbs Ver también para F1AA0005OB:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
Remove the red stop (a) and replace it against
the stationary stop (c) to prevent the valve stem
from turning further.
Turn the lever to the off position once the
temperature is set.
NOTE: Seasonal maintenance of the maximum outlet
temperature may be required due to changes in groundwater
temperature.
a
b
a
c
b
Secure the escutcheon (D) onto the valve body (I)
with the escutcheon screws (E).
Install the handle (F) using the set screw. Tighten in
place using the allen wrench (K).
a
b
a
c
b
9
Replace the valve cap (1) onto the valve body (I).
I
D
E
F
HOMEDEPOT.COM/GLACIERBAY
1
I
K

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

F1aa0005bnv

Tabla de contenido