Installation Instructions - Cequent 65074 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Cequent
Performance Products, Inc.
www.cequentgroup.com
Technical Assistance:
TechnicalSupport@cequentgroup.com
Applications:
Years
Make
2014-Current* Toyota
*Visit our website for the most up to date
information regarding application years
and trim levels.
Equipment Required:
Safety
Ratchet
Glasses
14 mm
19 mm
Torque
Sockets
Wrench
DO NOT EXCEED LOWER OF TOWING VEHICLE
MANUFACTURER'S RATING OR:
CARGO CAPACITY – Do not exceed
Gross Axle Weight Rating, (GAWR).
9,000 lb.
(4086 Kg)
©2016 Cequent™ Performance Products, Inc. -

Installation Instructions

800-632-3290
PART NUMBERS: 65074, CQT65074
Installation Time:
Models
The time listed above is the average time
for professional installers. If you do not
4Runner
feel comfortable performing this
installation on your own or are in need of
assistance, please contact a professional
installer.
Scan for step by step PHOTO
Optional
http://www.cequentgroup.c
Soapy water or
small hole brush
500 LB. (227 Kg) or Truck Front
MAXIMUM WINCH LINE PULL
Printed in Mexico
20 Min.
installation instruction or
visit
om/qr-product.aspx
Sheet 2 of 9
Representative Vehicle Photo
Front of
Hitch Illustration
65074N
9-23-16
Vehicle
Rev. A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cqt65074

Tabla de contenido