4. For Three-Way Installations
Install 1/2" copper tubing or 1/2" piping for all accessories.
Securely fasten the piping and outlet ells to the framing.
Install temporary 1/2" nipples in the outlet ells so they extend a
minimum of 2" (5.1 cm) beyond the finished wall.
Turn on the water supply to the transfer valve and check the
transfer valve for proper operation and leakage. Once everything
is verified, turn off the water.
Install caps on the temporary bath and shower nipples. Turn on
the water and check for leaks. Once no leakage is verified, turn
off the water.
Complete the finished wall.
Remove and discard the plaster guard.
1041156-2-A
Accessory Water Lines
1/2" Copper Tubing or
Piping
Mixed Water
Supply 3/4"
Copper
Tubing or
Piping
6
Kohler Co.