7.10) Wiring diagrams
8 Preliminary study
8.1) Resistance characteristics of the host construction
GB
"Important":
8.2) Characteristics of the installation / uninstall surface
"Important":
"Danger":
"Danger":
"Important":
9 Installation
9.1 Provisions prior to installation
•
9.2) Preliminary checks before installation
"Danger":
9.3) Installation of the Sodenic™ crane
10 Commissioning
10.1) Preliminary Checks
Verify:
10.2) Electrical recommendations