Pre-Installation Requirements - Glass 1989 ANANDA 150 Manual De Instalación - Uso - Mantenimiento

Tabla de contenido

Publicidad

EN
issued at the time of testing.
itself.
clearing detergents, etc..
cabin with water that is too hot. Use water
consult a doctor before using the
consult a doctor before using the
or medicines before and during the
unconsciousness.
instruction concerning use of the
of misuse.
All measurements are in mm.
PRE-INSTALLATION
REQUIREMENTS
C.P.
To make the electrical connection to
When making the connection to the
differential thermal breaker.
meeting the relevant standards.
GROUNDWIRE.
The ground wire must be connected
EQUIPOTENTIAL CONNECTION.
The
following
accessories
supplied by the manufacturer) are
pipes provided in the kit and no
other types of piping must be used).
ROUTINE AND
SPECIAL MAINTENANCE
To
clean,
see
the
"Cleaning
Special maintenance must be carried
In case of failures or malfunctioning of
rights. The manufacturer shall not be held
TROUBLESHOOTING
In the event of abnormalities run the
following checklist.
12
All
electrical
connection
must be performed by an electrical
installation technician.
- The switch is on.
All hydraulic connection checkup
must be performed by a hydraulic
installation technician.
(not
and
checkup

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ananda 190

Tabla de contenido