Descargar Imprimir esta página

Kohler K-1000-H2 Guia De Instalacion página 2

Ocultar thumbs Ver también para K-1000-H2:

Publicidad

Idiomas disponibles

Idiomas disponibles

16-1/8"
(41 cm)
58" (147.3cm) to
60" (152.4cm)
From Floor of Bath
60"
(152.4 cm)
Fascia Front
For Custom Tower Pump Kit
18-5/8" (47.3cm) Up From Sub-Floor.
Allow For Vertical Adjustment.
Product Information
Applicable product:
10-jet tower
Fixture:
Weight
Required accessories:
*Custom tower pump
Corner footbath OR
Alcove footbath, left drain OR
Alcove footbath, right drain
Alcove enclosure OR
Corner enclosure
*For custom component installation.
Recommended accessories:
*Custom drain
*For custom component installation.
1030202-1-B
3/8" (1 cm) D.
Hole (Drill First)
2-3/8" (6 cm) Up From
Back of Seat Deck
Surface
K-1000-H2
50 lbs (23kg)
K-1001-H2
K-1005-H2
K-1015-H2
K-1016-H2
K-5161-L
K-5162-L
K-7179
12" (30.5 cm)
Stud Opening
Keypad
1-5/8"
(4.1 cm) D.
Hole
14-1/4"
(36.2 cm) Box
Notes
Install this product according to the installation guide.
Locate the keypad within reach of the control box. An 8' (2.4 m)
cable is included.
Installations employing the K-5161-L alcove enclosure or the
K-5162-L corner enclosure are not designed for steam applications.
The unit may not perform satisfactorily as a steam unit.
Blind installations on the backside require a 1-7/8" (4.8 cm) to
2-1/2" (6.4 cm) diameter hole for the keypad nut.
2
11-7/8"
(30.2 cm)
62-3/4"
(159.4 cm)
Box
Attaches to
3-1/4" (8.3 cm)
Plumbing From
Pump
Must Line Up With L of
Plumbing From Pump
C
Kohler Co.

Publicidad

loading