4
Carefully attach the SLATS [K] to the UPPER SAFETY RAILS (G). Lock the SLATS (K) into place with 44 PLASTIC PLUGS (R), as
shown in detail (1 & 2).
Attach the 21 SLAT SPACERS (N) between SLATS (K) as shown in detail (3).
G
K
DETAIL (1)
R
R
G
K
DETAIL 2
L
K
R
K
K
K
L
10 /15
K
N
K
DETAIL (3)
G
L
B34313609605