Installation, cont'd.
Hose Barb Planning
Regardless of installation selection, plan to minimize stress points on the hose.
RECOMMENDATION: Plumb the hose barb AT OR NEAR BOTTOM of the compartment with the hose barb pointing AWAY
NOTICE
from the RV coach.
o
90
Hose Barb - Plumbed from Bottom,
Side, or Back
Electrical Planning
2A
K4
Ref.
Description
K1
Macerator Pump
K3
Macerator Switch
K4
35A Fuse/Breaker
2A
Battery
2B
Relay
2C
Over-Temperature Switch (90°C) normally closed
2D
Ground
Wire Gauge Size Chart
If Wire Gauge for distance from
source* is:
12 VOLTS - Install
* Distance measured assumes power
and ground wires
Wire Size
Fig. 3
represents recommended wiring confi guration. Other wiring confi gurations are possible based on your installation.
■
Wiring confi guration MUST include internal over-temperature switch and relay for protection of pump.
■
Pump requires a 12-VDC/35 AMP dedicated circuit with 35 AMP breaker or fuse between main bus or battery.
■
Wire size is dependent on distance between pump and power source. Actual wire sizes should be calculated according to instal-
lation.
97572 Rev. B (07/10/2017)
Fig. 2
Switch Box Assembly
2B
85
86
0-18 feet
19-32 Feet
(Included)
10 Gauge
8 Gauge
Fig. 3
4
K3
K1
The positive and negative wires should be braided to
NOTICE
prevent radio interference during operation.
While the pump is turned on, verify electrical system
NOTICE
AVISO
AVIS
!
CAUTION
by measuring voltage at motor; (must be 12V).
Improper installation may cause damage to motor or
decrease pump effi ciency.
33-50 feet
6 Gauge
Pump Assembly
2C
18G BLU
18G BLU
Included in product
Circuit Breaker
35 amp
®
SANICON
Turbo - Model 500
2D
2D