EN
Safety warning!
For the illustration, see page 98.
2. INSTALLATION
Instructions which must be followed by the drive and home automation professional installing the Glydea
Ultra motor.
Never drop, knock, drill or submerge the drive.
Install a separate control point for each drive.
2.1. INSTALLATION
2.1.1. Installation of the rail (Fig A)
1) Mark the position of the brackets.
2) Drill the ceiling or the wall at the right places.
3) Attach the brackets.
4) Attach the rail on the brackets.
2.2. WIRING
(Fig C)
Cables which pass through a metal wall must be protected and isolated using a sheath or sleeve.
Attach cables to prevent any contact with moving parts.
Leave the drive power supply cable accessible: it must be possible to replace it easily.
Switch off the power supply.
-
Connect the drive according to the information in the table below:
-
AC wiring
(Fig C1)
1
2
3
4
Never connect 2 control points to a single drive
Compatible controls - Wiring of control
1) Inis Uno
2) Série espace
3) Centralis Uno IB
2.3. COMMISSIONING
Setting can be done only when one of the two live wires are connected permanently to the power.
Setting using the Mode and Set drive buttons and an AC switching control
A Small paper clip is needed to press the Mode and Set buttons.
Power the drive in one direction during setting
The curtain will run at low speed to one end and then return to set both End Stop positions. It will then go
back at normal speed.
Leave the drive powered in the same direction until it has finished this process.
2.3.1. Press the M button until the green LED switches on to enter setting mode.
You can exit from the setting mode at anytime, by pressing the M button until the LED switches off.
4
Wire
Neutral
Live
Live
Earth
(Fig F)
Copyright © 2017 SOMFY ACTIVITES SA, Société Anonyme. All rights reserved
Caution!
2.1.2. Installation of the motor (Fig B)
1) Unlock the motor
2) Insert the motor shaft into the drive pulley hole.
3) Lock the motor.
100V to 240V
Blue
Brown
Black
Yellow / Green
(Fig C2)
(Fig D)
Information
.