Installation; Opening The Units; To Open The Outdoor Unit; Mounting The Outdoor Unit - Daikin RXS50K2V1B Manual De Instalación

Ocultar thumbs Ver también para RXS50K2V1B:
Tabla de contenido

Publicidad

5 Installation

▪ Use polyethylene foam as insulation material:
▪ with a heat transfer rate between 0.041 and 0.052 W/mK (0.035
and 0.045 kcal/mh°C)
▪ with a heat resistance of at least 120°C
▪ Insulation thickness
Pipe outer diameter
Insulation inner
)
diameter (Ø
p
6.4 mm (1/4")
8~10 mm
9.5 mm (3/8")
10~14 mm
12.7 mm (1/2")
14~16 mm
15.9 mm (5/8")
16~20 mm
Ø
Ø
i
i
Ø
Ø
p
p
t
5
Installation
5.1

Opening the units

5.1.1

To open the outdoor unit

DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING
2
2
5.2

Mounting the outdoor unit

5.2.1

To provide the installation structure

1
Check the strength and level of the installation ground so that
the unit will not cause any operating vibration or noise after
installation.
2
Prepare 4 sets of M8 or M10 anchor bolts, nuts and washers
each (field supply).
3
Fix the unit securely with anchor bolts.
Installation manual
10
Insulation thickness
)
(t)
i
≥10 mm
≥13 mm
≥10 mm
≥13 mm
1
(mm)
In any case, provide at least 300  mm of free space below the unit.
Additionally, make sure the unit is positioned at least 100 mm above
the maximum expected level of snow. In this case, it is
recommended to construct a pedestal.
(mm)
a
Maximum snowfall height
If the unit is installed on brackets to the wall, install the unit as
follows:
RXS50+60 + RX50+60 + ARXS50~71
R410A split series
3P360062-1H – 2016.09

Publicidad

Tabla de contenido
loading

Tabla de contenido