Unit Start Up; Pressure Testing - Pfister VB8 Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

11
11A
11B
11D
11 TEST PLUG REASSEMBLY
Once all pipe joints are soldered, reassemble the Test Plug (11A) and Backup Plate
(11B) into Valve Body (11C). Secure tightly using Screws (11D).
12
12A
12A

12 PRESSURE TESTING

1
Use two
/
" iron pipe plugs (12A) (not included) on both Shower Outlet (12B) and Tub
2
Outlet (12C). Perform pressure test. Look for leaks from the outlets.
WARNING: Pressure testing is not to exceed 250 PSI. Make sure pressure is
balanced between hot and cold inlets.
WARNING: Differential pressure of hot and cold inlets must not exceed 100 PSI.
CAUTION: Slowly remove pipe plugs (12A) from tub and shower outlets to
relieve pressure.
Proceed to valve cartridge installation.
11C
12B
12C
ENGLISH

13 UNIT START UP

Turn on water supplies, and check all connections for leaks.
14
14A
14 MODEL WITH INTEGRAL VALVE STOPS
I
ntegral Stops (14A) provide an alternate means to shut off the water supply. With a flat
head screwdriver (14B), the entire water supply can be shut off by rotating the valve stem
(14C) clockwise. The integral stops can be used for temporary shutting off the water supply
to allow access to the cartridge assembly for maintenance.
15
15A
15B
15 PLASTERGUARD REPLACEMENT
Replace plasterguard (15A) into Valve Body and secure with Screws (15B).
Proceed to finish wall.
4
14A
14C
14B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Jv8 serieVb8-310aJv8-440pVb8-340aJv8-310pJv8-410p

Tabla de contenido