Complete The Installation - Kohler K-12515 Guia De Instalacion

Baño de asiento
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Attach the Pedestal
CAUTION: Risk of personal injury or product damage. Do not over-tighten bolts. Vitreous china
can break or chip if nuts are over-tightened.
NOTE: The pedestal must be attached to the sitz bath before installing the bath to the hangers.
Carefully turn the bath upside down.
Place the gaskets and the pedestal on the underside of the sitz bath and align the front hole.
Insert a toggle bolt into each hole on the sitz bath by holding the toggle bolt flat along side the
straps while sliding through the holes.
Pull the straps toward you until the toggle bolt rests flush against the sitz bath.
Hold the ends of the straps and slide the cap up to the head of the toggle bolt with the other hand
until the flange of the cap is flush with the sitz bath.
Insert the studs into the pedestal and thread into the toggle bolts.
Break the straps off by bending them back and forth, so the straps are level with the flange of the
cap.
Slide the washers on the studs and secure with the nuts.
Repeat the procedure for the two rear slots on the pedestal.

3. Complete the Installation

Install the drain, trap, bell supply, and flange according to the manufacturer's instructions.
Carefully mount the bath onto the hangers.
Turn on the water supply and check for leaks.
1063549-2-A
Hole
Wall
Locations
Hanger
Hanger
Screw
Sitz
Bath
Toggle
Bolt
Slot
Hole
Pedestal
4
Toggle
Bolt
Sitz Bath
Cap
Strap
Pedestal
Gasket
Stud
Washer
Nut
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido