Commissioning
Commissioning the eSCHELL network
1.12 Commissioning the eSCHELL network
1.12.1 Principles of the eSCHELL network
no ledge of the follo ing relationships is important to understand the pro
cedures for commissioning the eSCHELL net or . Especially
or is to be set up using eSCHELL
Commissioning of Network
To create the commissioning net or , all eSCHELL bus e tenders (fittings)
are loaded and available devices are searched for. This is important for the
eSCHELL
ireless bus e tender
t een the eSCHELL
e tenders E F.
The eSCHELL cable bus e tenders E
net or , but their assignment is clear through the cable connection and can
not be changed.
The eSCHELL
ireless bus e tenders E F
server are no
selected from the commissioning net or s device list. Saving
this selection creates the so called live net or .
Live network
The eSCHELL bus e tenders (fittings) of the live net or are permanently as
signed to the respective eSCHELL
cable bus e tenders E
CHELL
ireless bus e tenders E F, this assignment means that no other eS
CHELL
ater management server can access them.
This also means that an eSCHELL
be moved from one net or to another —
management server —
1.12.2 Starting commissioning
Path: System Setup
Note!
> The fittings and the eSCHELL bus e tenders must be provided
ith electrical po er for them to be detected by the eSCHELL
water management server.
»
Start the commissioning of the eSCHELL net or by clic ing on the Sys
tem Setup menu item.
ireless bus e tenders E F.
E F so as to enable clear assignment be
ater management server and the eSCHELL
are also listed in the commissioning
ater management server.
, this is defined via the cable connection.
ireless bus e tender E F cannot simply
ithout cancelling this assignment.
hen the net
ireless bus
hich are to be assigned to the
ith eSCHELL
ith a different eSCHELL
ith eS
ater
EN
145