Descargar Imprimir esta página

Eaton MWS Instrucciones De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions – MWS
120V/ 277V/ 347V
Ground
Neutral/WH
Hot 1/BK
Hot 2/RD
Hot 3/BU or ORG
120V/ 277V/ 347V – 2 Circuit, 2 Neutral
Ground
Neutral 1/NB
Hot 1/BK
Hot 2/RD
Neutral 2/ORG
208V/ 240V/ 480V
Ground
Hot 4/YW or WH
Hot 1/BK
Hot 2/RD
Hot 3/BU or ORG
Starter Fixture Cable "SF"
Starter Fixture Cable (SF)
#12 Loads
Wire Leads Per
Starter Cable may
run down wall to
Switch Box
SL - Single Level, DL - Dual Level, SE - Single Level w/EM
Wire fixture before placing in ceiling Grid.
Fixture Fitting "FF"
Starter (ST)
Switch Drop "SD"
Extender Cable (EC)
Switch Drop (SD)
Extender Cable (EC)
N
ote:
Fixture Cables, Fixture Fittings, Tee Cord Drops and Drop Cords may be
ordered factory attached by Cooper Lighting.
4
EATON
ADM140814
Ground
Neutral/WH
Hot 1/BK
Hot 2/RD
Hot 3/BU or ORG
Ground
Neutral 1/NB
Hot 1/BK
Hot 2/RD
Neutral 2/ORG
Ground
Hot 1/BK
Hot 2/RD
Hot 3/BU or ORG
Hot 4/YW or WH
Extender Cable (EC)
Fixture Cable (FC)
Installation instructions - MWS
16/2G 16/3G 16/4G
16/2G 16/3G 16/4G
Fixture Cable or
Extender to next Figure
Fixture Wiring
Fixture Fitting (FF)
Fixture Wiring
With fixture cables
run switch drop from
switch box to above
ceiling
Single Level
Dual Level
T Cable "TC
"
Drop Cable "DC"
Alternative - Fixture Fitting "FF"
Extender Cable (EC)
Switch Drop (SD)
Fixture Fitting (FF)
Run switch Drop to first Fixture Fitting
With Fitting
Run 15' "SD"
from SW box to
first fixture.
Extender Cable (EC)

Publicidad

loading