Frame rail
Hitch Shown In Proper Position
Equipment Required: Pull wires (provided) ,
lubricant or soapy water.
Fastener Kit: 24892F
Wrenches: 3/4
Drill Bits: 1/2
4 4 4 4
3 3 3 3
3/4"
3/8"
1.00
Figure 2.
Access hole modification to allow
for block and carriage bolt.
1 1 1 1
Qty. (1)
Carriage bolt ½-13 X 2.50 GR5
2 2 2 2
Qty. (1)
Spacer ¼'" X 1.50 X 3.00
3 3 3 3
Qty. (3)
Conical washer
Note: sort hardware prior to hitch installation to confirm bolt lengths are installed in proper locations.
1.
Lower exhaust by removing rubber isolators from muffler hangers. Spraying a lubricant or soapy water on the metal hanger rod and the
rubber isolator helps removal.
2.
Enlarge access hole to allow for block and carriage bolt use ½" drill bits (See Figure 2.) or use a die grinder to enlarge the access hole in
bottom of frame rail. See Figure 2. Paint any bare metal.
3.
Feed pull wires with spacer and bolt (item 5 & 6) into frame rail thru enlarge access hole and out the attachment holes. Leave pull wires
attached.
4.
Raise hitch into position with bridge over tailpipe and tie down bracket over tie down hook. Feed pull wires thru holes on hitch bracket and
continue to pull fasteners through frame rail and adjacent holes in brackets. Carefully remove pull wires and attach conical washers and nut
finger tight only (Be careful not to push fastener back into frame rail).
5.
Install ½-13 x 2.50 carriage bolt into tie down bracket slot, thru tie down hook and attach spacer, conical washer and nut finger tight only.
6.
Reinstall muffler .
7.
Torque all fasteners to specifications shown below.
8.
Paint any exposed metal.
Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to
prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working
beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5
and SAE J684.
© 2012, 2015 Cequent Performance Products, Inc – Printed in Mexico
Installation Instructions
Fascia
(Sold separately)
Drawbar must be used in the
RISE position only.
Frame rail
6 6 6 6
5 5 5 5
Access hole
Remove rubber isolator
at this location
Tighten all ½-13 GR 5 fasteners with torque wrench to 75 Lb.-Ft. (102 N*M)
Nissan Juke
Front Wheel Drive
Drawbar Kit:
3593
Bridge
Tie down
bracket
Figure 1.
4 4 4 4
Qty. (3)
Hex nut ½-13
5 5 5 5
Qty. (2)
Carriage bolt ½-13 X 1.75 GR 5
6 6 6 6
Qty. (2)
Spacers ¼" X 1.00 X 3.00
Sheet 1 of 3
Part Numbers:
Do Not Exceed Lower of Towing Vehicle
Manufacturer's Rating or
2000 LB (908 Kg) Max Gross Trailer Weight
200 LB (90.8 Kg) Max Tongue Weight
Wiring Access Location:
Tie down
hook
1 1 1 1
2 2 2 2
3 3 3 3
4 4 4 4
24892N
10-6-2015
Form F206 Rev A 5605
24892
60311
77280
Tie down
hook
1 1 1 1
2 2 2 2
3 3 3 3
4 4 4 4
Tie down
bracket
Rev. B