Tools And Materials; Before You Begin - Kohler K-2216 Guia De Instalacion

Lavabo empotrado con azulelos
Ocultar thumbs Ver también para K-2216:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Tools and Materials

Tape
Measure
Scissors
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.

Before You Begin

CAUTION: Risk of personal injury or product damage. Handle
with care. Vitreous china can break or chip if the product is
handled carelessly.
Observe all local plumbing and building codes.
Prior to installation, unpack the new lavatory and inspect it for
damage. Return the lavatory to its protective carton until you are
ready to install it.
Inspect the drain and supply tubing. Replace if necessary.
Do not substitute another sealant if one is supplied with this
lavatory.
Use the template supplied with the lavatory.
For replacement installations, make sure the existing cutout is the
same size or smaller than needed for the new lavatory.
Failure to follow these precautions may result in a poor
installation.
1018895-2-B
Sealant
Drill
Claw
Jigsaw
Hammer
2
Pencil
Safety
Glasses
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-2257

Tabla de contenido