Pentair MASTERTEMP 125 Guía De Instalación Y Usuario página 21

Ocultar thumbs Ver también para MASTERTEMP 125:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

The allowable vent runs for each vent pipe diameter are different and can not be exceeded.
Each 90-degree elbow reduces the maximum horizontal vent run by 12 feet and each 45-degree elbow
in the vent run reduces the maximum vent run by 6 feet. See Table 5 on page 20 for the maximum vent
lengths using 90-degree and 45-degree elbows.
2. Install the metal Flue Collar in the Vent Body of the
heater (located under the outside vent cover). Fasten the
metal Flue Collar to the Vent Body with two #10 sheet
metal screws. Use high temperature silicone RTV to seal
the Flue Collar to the Vent Body. Before connecting the
metal Flue Collar to the Vent Body, wet a clean cloth or
paper towel with isopropyl alcohol (rubbing alcohol) and
vigorously wipe the socket of the Vent Body. Immediately
wipe the cleaned surfaces dry with a clean cloth or paper
towel. Repeat for the exterior of the 4" end of the metal
Flue Collar. Attach the metal Flue Collar to the Vent Body
using the RTV supplied with the kit, following the vent
manufacturer's instructions (included with kit).
3. Attach the vent pipe to the metal Flue Collar with sheet-
metal screws.
WARNING
Risk of fire or asphyxiation if vent is not assembled
according to manufacturer's instructions or
if vent parts from different manufacturers are
mixed. Vent parts from different manufacturers
ARE NOT interchangeable. Mixing parts from
more than one manufacturer may cause leaks or
damage to vent. When assembling a vent, pick one
manufacturer and be sure that all vent parts come
from that manufacturer and are specified by the
manufacturer for your system. Follow manufacturer's
instructions, local code requirements, National
Fuel Gas Code requirements (U.S.) or standards
CSA B149.1 and B149.2 (Canada) carefully during
assembly and installation.
Rev. C 3/2019
Section 3. Installation Instructions
NOTE
Min. 10 Ft.
6" Minimum
Clearance to
Combustible
Materials
Class B Double Wall
Metal Vent Pipe
Metal Flue
Collar
Vent
Body
Typical Metal Vent Pipe Installation - U.S.
Figure 13. –
(Vertical – Negative Pressure)
Min. 2 Ft.
Min. 10 Ft. (3.3 M)
(.7 M)
6" (15 cm) Minimum
Clearance to Combustible
Materials
Double Wall
Metal Vent Pipe
Vent
Body
Typical Metal Vent Pipe Installation
Figure 14. –
Canada (Vertical – Negative Pressure)
MASTERTEMP 125 Pool and Spa Heater Installation and User's Guide
Listed
Termination
Cap
Storm Collar
Flashing
Firestop
Support Vertical
Vent Pipe so
adapter does not
take weight of
pipe.
Approved
Termination
Cap
Storm Collar
Flashing
Firestop
Metal Flue
Double Wall
Collar
Metal Vent Tee
Support Vertical
Vent Pipe so
adapter does not
take weight of
pipe. Dispose
Condensate
of condensate
Drain w/trap
according to
local codes.
21

Publicidad

Tabla de contenido
loading

Tabla de contenido