3M DBI-SALA FLEXIGUARD M100 Manual De Instrucciones página 12

Ocultar thumbs Ver también para DBI-SALA FLEXIGUARD M100:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
Inspection Date:
Components:
Inspection:
Counterweight
Inspect the Counterweight Base for structural defects or damage including, but
Base
not limited to: bends, corrosion, and cracks.
Verify that there is no missing concrete from the Counterweight Box.
The Counterweight Base should be periodically greased using the grease fitting
(A) located on all M100 Jib Booms. See Figure 10 for reference.
Labels (Figure 7)
Verify that all labels are present and fully legible.
Fall Protection
Additional Fall Protection equipment that is used with the product should be
Equipment
installed and inspected per the manufacturer instructions.
Serial Number(s):
Model Number:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Table 2 – Inspection and Maintenance Log
Inspected By:
(See Section 4 for Inspection Frequency)
Date Purchased:
Date of First Use:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Competent
User
Person
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:
Next inspection due:

Publicidad

Tabla de contenido
loading

Tabla de contenido