Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLING DRIVE PULLEY
1. Remove the discharge chute from the deck. (Deck
configuration will vary by size and model)
2. Lower deck to the lowest cutting position.
3. Remove the right hand (discharge side) belt cover
from the deck.
4. Relieve the tension from the deck belt and remove
from the center deck pulley.
(See Operator Manual if necessary)
5. Remove the nut securing the right hand deck pulley
to the spindle.
6. Install drive pulley included in collection system kit
on top of the current deck pulley.
Drive Pulley
7. Reinstall the nut on the spindle and torque to 55-75
ft/lbs.
8. Reinstall the deck belt.

ASSEMBLY

MOUNTING BLOWER ASSEMBLY
1. Position blower over the discharge tabs on the deck
2. Be sure the blower is sitting flush against the
Belt Cover
3. Install the front mount bracket to the deck with the
Outer Pulley Cover
and set blower onto the deck.
outside of the deck.
Rear Mount Bracket
Contact Area
clevis pin and hairpin supplied with the kit.
Hairpin
Clevis Pin
5

Publicidad

Tabla de contenido
loading

Tabla de contenido