4B_Visible Cable Installation Procedure - ELICA SNAP Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 57
10.
REFIT THE AESTHETIC COVER AND CONNECT THE ELECTRONICS OF SNAP
EN
12.
REFIT THE GLASS ON THE AESTHETIC
11b.
gently press on the entire
COVER
perimeter
8
11.
HOOK THE AESTHETIC COVER TO THE FRAME
11a
Warning!
arrange the electronics
wires in such a way that
they do not get stuck
during closing
SNAP CAN BE FED BY THE MAINS
POWER NETWORK. IT IS NOW READY
TO BE CONFIGURED

4B_Visible cable installation procedure

1.
MAKE A HOLE IN THE WALL OR USE AN ALREADY EXISTING ONE
Ø 120 mm
2.
REMOVE THE GLASS FROM THE AESTHETIC COVER, BY
GENTLY PRESSING ALL ALONG THE PERIMETER IN ORDER TO
DISENGAGE IT FROM THE MAGNETS
3.
DISENGAGE THE AESTHETIC COVER BY GENTLY PRESSING ON
THE REAR PANEL
3a
3b
EN
9

Publicidad

Tabla de contenido
loading

Tabla de contenido