Descargar Imprimir esta página

Delta MULTICHOICE JETTED SHOWER R18222 Manual Del Usuario página 3

Cuerpo de la válvula para la instalación preliminar de las regaderas de una manija universal

Publicidad

Idiomas disponibles

Idiomas disponibles

R18448 & R18448-WS
2
1
2
R18448 & R18448-WS Installation
Remove the bonnet nut, stem and stem
extender, seat, spring, and plasterguard
(1), plus, the screen, test cap, bonnet nut,
plasterguard and cover (2) before soldering.
Connect valve body to water supplies using
the proper fittings. Note: (3) is the cold
inlet port and (4) is the hot inlet port.
Solder a copper tube (5) from the valve
body to the jet module so the jets are at
the desired height. Solder another tube (6)
onto the top of the jet module to the shower
arm elbow to the desired height. It is
recommended to mount valves to stringers
as shown.
The pipe (7) between valve & tub spout
must be a minimum of 1/2" (13 mm) copper
pipe or 1/2" (13 mm) iron pipe in a straight
drop no less than 8" (203 mm) but no more
than 16" (406 mm) long with only one 90
degree elbow to the spout nipple. If any
6
5
4
3
10
9
8
16"
7
(406 mm)
Max
outlet port is to be unused, seal the port with
a pipe plug.
If you are making a back to back or reverse
installation (hot on right and cold on left)
install the valve body as described, but
reverse the water supply lines.
After soldering, reinstall all parts in reverse
order; ensure bonnet nuts are tightened
securely. Then install the stops into the body;
be careful not to overtighten the nuts.
Note: Install stops in the w/stops version as
follows: Thread nut (8) on stem (9) as shown.
Then press stem and nut assembly into body
(10) and tighten using a 3/8", 6 point, deep
well socket. With a flat head screwdriver, adjust
stem clockwise to close and counterclockwise
to open.
4
R18442 & R18442-WS
2
8
9
2
R18442 & R18442-WS Installation
Remove the bonnet nut, cartridge and
plasterguard (1), plus, the screen, test cap,
bonnet nut, plasterguard and cover (2) before
soldering. Connect valve body to water
supplies using the proper fittings. Note: (3)
is the cold inlet port and (4) is the hot
inlet port.
Solder a copper tube (5) from the valve
body to the jet module so the jets are at the
desired height. Determine whether a three
or six function configuration is desired. For
2 port, 3 function; solder plug into auxiliary
port (6) in casting. Solder tube (7) into the
main port of the jet module to the shower
arm elbow to the desired height. For 3 port,
6 function; all outlet ports are used. It is
recommended to mount valves to stringers
as shown.
The pipe (8) between valve & tub spout must
be a minimum of 1/2" (13 mm) copper pipe
or 1/2" (13 mm) iron pipe in a straight drop
7
3 Port, 6 Function
Installation
9
1
4
12
16"
(406 mm)
Max
no less than 8" (203 mm) but no more than 16"
(406 mm) long with only one 90 degree elbow
to the spout nipple. If any outlet port is to be
unused, seal the port with a pipe plug.
If you are making a back to back or reverse
installation (hot on right and cold on left) install
the valve body as described, but reverse the
water supply lines.
After soldering press the detent (9) into proper
hole as shown, reinstall all parts in reverse
order; ensure bonnet nuts are tightened
securely. Then install the stops into the body;
be careful not to overtighten the nuts.
Note: Install stops in the w/stops version as
follows: Thread nut (10) on stem (11) as shown.
Then press stem and nut assembly into body
(12) and tighten using a 3/8", 6 point, deep
well socket. With a flat head screwdriver, adjust
stem clockwise to close and counterclockwise
to open.
5
2 Port, 3 Function
Installation
7
6
5
3
10
11
11
10
8

Publicidad

loading