MARTINS Industries TC-15 Manual Del Usuario página 6

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

During this operation, the conveyor
must be supported by a lifting sling.
Place and maintain in a temporary manner the base of the conveyor on the ground.
Mark the final location of the holes at the base of the conveyor and drill 4 holes of 10 mm / 3/8" of diameter.
SECONDARY CONTROL BOX FASTEN
1. Secondary Control box must be fastened on building structure, wall, building ramp or other so it remains fixed.
The Secondary box must be fastened so it can be visible when standing from the Main Control box.
2. Box can be fastened into wood or concreate structure.
3. Place the Control Box at desired place and hold still.
4. Mark the 4 holes position, 4 bolts are needed to fix the box. Use the pattern that fits best.
5. If fixed in concreate structure, drill pre-holes at marked positions. Use the provided drill bit.
6. Aligned the Control box with the holes and fix it using concreate bolts.
7. If fixed in wood structure, screw bolts halfway at marked position then unscrew.
8. Aligned the Control box with the holes and fix it using the concreate bolts.
Concreate structure bolt with
pre-holes and drill bit
Holes
Wood structure

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tc-18Tc-21Tc-24

Tabla de contenido