Chemo KS-MOBIL 400 Manual Del Usuario página 6

Tabla de contenido

Publicidad

GB
Installation and operating
instructions
1. Applicable documents
-
Operating instructions for hand pump (option)
-
Operating instructions for electric pump (option)
-
Installation instructions for threaded cable
connection (option)
-
Operating instructions for flow meter (option)
-
Operating instructions for leak indicator display unit
-
Installation instructions for limit indicator
Note: Handwheel and hose for test valve is placed
with the tank documents.
2. Electrical connection of the pump to the
power source
has to be performed by a certified electrical spe-
cialist according to directive VDE 0100 issued by
the German Association for Electrical, Electronic
& Information Technologies.
-
Recommended cable: Ölflex
-
Cable cross-section according to the pump used
(voltage)
-
Outside cable diameter 6 - 12 mm
-
Cable insertion in the pump according to threaded
cable connection installation instructions
3. Installation conditions
The installation requirements are specified in the
legal regulations governing water, commerce and
construction.
4. Commissioning
-
Remove the cover of the coupling (item 6). Attach the
ventilation pipe (item 1) and fasten with the coupling.
-
Turn the ball valve of the discharge line (item 2) to
the „open" position.
-
Operate the hand pump and start the tanking
procedure (option).
-
Switch on the electric pump, open the delivery
nozzle and start the tanking procedure (option).
-
The filling level in the container is checked by
unscrewing the dip stick cap (item 4) and remo-
ving the dip stick.
Note: Before starting the tanking procedure, the
ventilation pipe and the ball valve of the
discharge line always have to be opened.
5. Filling the tank
Unscrew the cap on the filler neck (item 3). The con-
tainer is to be filled using a fixed filling connection.
6
The limit indicator (item 5) has to be connected for
this. The factory setting for the limit indicator is a
filling level of 95%.
Note: The ventilation pipe has to be open to
fill the container.
6. Preparing the container for transportation
-
Close the filler neck (item 3) and dip stick cap
(item 4) tightly.
-
Detach the ventilation pipe (item 1) from the cou-
pling (item 6). Close the opening tightly using the
cover of the coupling.
-
Turn the ball valve of the discharge line (item 2) to
the „shut" position.
Note: If excess pressure builds up in the closed
container during storage or transport due
to increased temperature, this pressure is
relieved via the safety valve.
7. Periodic tests, inspections
According to ADR, 6.5.4.4.1 a), the CHEMO KS-
MOBIL shall be inspected to the satisfaction of the
competent authority at intervals not exceeding five
years with regard to matching the model including
labeling as well as the internal and external condition
and the proper functioning of the service equipment.
The interior space is excluded from this inspection.
This is inspected for the first time after ten years and
then subsequently every five years.
Note: A report on each inspection is to be kept by
the owner at least until the next inspection.
The leak indicator is to be checked for functioning at
least once each year. This should include inspection
of leak indicator fluid flow at the test valve according
to 3.3 of the operating instructions for the leak
indicator display unit.
In addition to this, the container should be inspected
according to ADR 6.5.4.4.1 b) to the satisfaction of
the competent authority at intervals not exceeding
two and a half years with regard to its external
condition and the proper functioning of the service
equipment.
Important
According to ADR 5.2.1.2 and 5.2.1.4, each fuel con-
tainer used for carriage must be clearly and indelibly
labelled with the UN number of the contents and the
hazard label on both sides.
Two copies of the UN number 1203 for petrol and
the hazard label (flame on a red background) are
enclosed.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ks-mobil 600

Tabla de contenido