Chapter Iii Preparation For Installation - SATA AE5001H Manual Del Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 185
中文
AE5001/AE5001-3
EN
DE
RU
KO
PT
JA
ES

Chapter III Preparation for Installation

3.1 Unpacking
Open the packing case, remove the surrounding packing materials, inspect the machine for damage during transportation, and inspect the
main components and accessories for completeness as per the packing list. Keep packing materials away from children so as not to pose
any danger, and properly dispose them if they may cause pollution.
3.2 Foundation
The user has a responsibility to ensure the stability of the foundation. The concrete shall have a minimum thickness of 250mm and a
minimum strength of 21MPa, and shall be properly prepared 30 days prior to the installation date. No other foundation equipment is allowed
within 279mm of the expansion bolt to avoid degrading the foundation strength. The user has a responsibility to provide safe power, air
source, and such connecting components as power wire.
3.3 Tools
- 5m tape
- Chalk
- Proper impact drill and bit (expansion bolt M18X160)
- Hammer
- Proper wrench
- 1.2m spirit level
- Crowbar
- 4m ladder
- Proper screwdriver
- 100mmx100mm woodwork (for laying the post flat to protect the paint surface)
34

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ae5001-3

Tabla de contenido