中文
AE5401/AE5401-3
EN
DE
RU
KO
PT
JA
ES
Chapter III Preparation for installation
3.1 Unpacking
All packing, loading/unloading, transportation and unpacking operations must be performed by professional personnel.
Transportation:
The scissor lift shall be loaded/unloaded and moved by a lifting machine and forklift with capacity over 3 tons. To prevent the scissor
lift falling off, one person shall pay attention to the scissor lift during the lifting operation for fear of accidents. The scissor lift shall be
transported by an automobile or ship. The scissor lift shall be inspected for completeness when it arrives,
For fear of damage or loss during transportation. If the packing box is broken during transportation, inspect the broken box according to
the Packing List, confirm the damaged articles and lost components, and at the same time, inform the carrier immediately.
The scissor lift is a heavy cargo. Therefore, manpower loading/unloading is forbidden. Safety in handling is of much importance. In addition,
the hoisting of scissor lift during loading/unloading shall be operated as illustrated.
Schematic diagram
Storage:
Machinery equipment shall be stored in an indoor warehouse, and waterproof treatment shall be adopted in case of outdoor storage. A van
truck shall be used for highway transportation, and a container for waterway transport. The control cabinet must be placed upright during
transportation, and be protected from squeezing by other goods.
44