Allmand 725 Instrucciones De Instalación página 9

Ocultar thumbs Ver también para 725:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

20
BB
24. Install the fork terminal end of each black wire (DD,
Figure 21a-b) on DC post 1 of 725 light relay 1, 2, and
3. Then, install the bare wire ends of the two black
wires into the open ports of the 5 port lever lock (EE,
Figure 21a-b) that was installed in Step 22.
21a
EE
DD
725 Relay 1
725 Relay 2
21b
EE
725 Relay 1
725 Relay
Connection Detail
CC
DD
725 Relay 3
DD
725 Relay 3
725 Relay 2
25. On Zettler light relay 2 disconnect the remaining 16
AWG wire (FF, Figure 22) from the DC power spade.
This wire should be leading from the divider panel of
the component block. On Zettler relay 1 disconnect
the 16 AWG wire from the same spade.
22
Zettler Relay 2
Zettler Relay
Disconnection Detail
26. Cut off and discard the female spade terminal from
the wire that was connected to the Zettler relay. Strip
off the appropriate amount of wire insulation and install
wire (GG, Figure 21) into a 5 pin lever lock (HH, Figure
21, Ref. 10) from the kit contents.
23
HH
FF
GG
en
9
English

Publicidad

Tabla de contenido
loading

Tabla de contenido