Kohler K-2011 Guia De Instalacion página 3

Ocultar thumbs Ver también para K-2011:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

K-2011-8
Finished
14-1/2"
Wall
(36.8cm)
2-7/8"
(7.3cm)
11-3/16"
(28.4cm)
23-7/8"
(60.6cm)
10"
8-1/2"
(25.4cm)
(21.6cm)
13-1/4"
(33.7cm)
3/8" Hot
1-1/4" Outlet
4"(10.2cm)
1. Preparation
Install the water supplies and drain pipes according to the
roughing-in information. Install the supply stops so the handles
will not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a
secure material for the anchoring devices.
Mark the centerline on the floor with a pencil.
Position the pedestal on the floor centerline location at the
required distance from the finished wall. Refer to the roughing-in
information for the required distance.
Kohler Co.
4" (10.2cm)
2-1/4" (5.7cm)
8-1/4"
(21cm) 17-7/8"
(45.4cm)
K-2013-8
1/2" (1.3cm) D. Mounting Hole in Pedestal
K-2011-8
1/2" (1.3cm) D. Mounting Hole in Pedestal
Finished Wall
4-1/2" (11.4cm)
7-5/8"
(19.4cm)
10"
1/2" (1.3cm) D.
(25.4cm)
Anchor Holes
in Lavatory
34"
(86.4cm)
3/8" Cold
3
K-2011-4
4"(10.2cm)
2-1/4"
(5.7cm)
K-2011-1
2-1/4"
(5.7cm)
K-2011-8
5-3/8"
(13.7cm)
K-2013-8
4-3/8"
(11.1cm)
1015629-2-B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-2013K-14012

Tabla de contenido