Start-up
6.2 Set temperature (power on)
A
4. Fill and flush the system.
5. Apply pressure to the system.
6. Open the venting screw by no more than one turn.
CAUTION
• Filling – flushing – tightness test according to valid regulations
• Protocol templates can be found in the Schlüter-BEKOTEC-
THERM Technical Manual.
7. Open the balancing valve to the "Standard" setting.
- Other settings may be required depending on the temperature in
the primary circuit.
8. Check the correct position of the temperature monitor STW.
1. Set the desired temperature at the thermostat control head
(see "Temperature table of the thermostat control head").
GB
A
33