Complete Frame Assembly; Complete Assembly - Gladiator Garageworks CADET Serie Instrucciones De Ensamblaje

Unidad de estantería de 5 o 6 estantes
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Complete Frame Assembly

1. Insert the top rivets of the long Z beam (P2) into the top keyhole
slots of the upright post (P1 or P5).
P2
2. Determine the vertical location of the remaining shelves.
NOTE: It is recommended to equally space the shelves from top
to bottom of the shelving unit.
3. Attach the remaining long Z beams (P2) and short Z beams (P3)
at the desired locations on the upright posts (P1 or P5).
4. Check that all Z beams are assembled in the upright position.
P2
P3
P3
P2
P2
P2
P3
P2
P3
5. Press the beam rivets to the bottom of the keyhole slots making
sure they are fully seated in the slots to lock the pieces together.
NOTE: The Z beams are adjustable in 1¹⁄₂" (3.8 cm) increments
allowing multiple shelf location configurations.

Complete Assembly

1. Place a laminated shelf deck (P4) inside the Z beams (P2 and
P3).
P3
2. Insert the post caps (P7) into the top of each upright post (P1 or
P5).
P2
3. Move the shelving unit to its final location.
NOTE: Unit with 5 shelves shown.
P4
P2
P4
P4
P4
P7
P3
P1
or
P5
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gars486xbg

Tabla de contenido