PREPARATION
1.
Remove the heater from the box and inspect it for
any damage. If it appears to be damaged, call
Uline Customer Service at 1-800-295-5510.
2. The heater should be installed out of traffic areas
and at least 6' off the floor. (See Figure 2)
14"
12½"
Front View
3. The direction of air flow should not be restricted
(i.e., by columns or machinery). The air should flow
perpendicular to exposed walls, rather than blowing
directly at them.
4. When more than one heater is used in an area, the
heaters should be arranged so that the air discharge
of each heater supports the air flow of the others to
provide best circulation of warm air. (See Figure 3)
PAGE 4 OF 21
INSTALLATION
Minimum
Figure 2
Distance to Wall
13"
12⁄"
6½"
Mounting
Location
1¾"
1/2", 3/4" (2)
Side View
Figure 3
MOUNTING
1.
Remove the mounting bracket from the heating unit
by loosening the bracket screws with a wrench and
slipping the handle off over the screw heads.
2. Locate a stud in the ceiling and attach the
mounting bracket to the ceiling joist. (See Figure 4)
Washer
Single-Screw
Mounting
Washer
Double-Screw
Mounting
3. Place a washer on the screw between the bracket
and the ceiling to act as a spacer and screw them
into the stud. Tighten the screws enough to securely
hold the heating unit with the air flow pointed in the
proper direction.
4. Lift the heater up and into the mounting bracket.
Align the screws on each side of the heater with the
keyhole slots in the mounting brackets. If the heater
is to be tilted, it must be positioned in the lower
keyhole slots. (See Figure 5)
5. Tighten the bracket screws so the unit is securely
suspended at the desired position.
Lower
Keyhole
Slot
Bracket
3/8" Diagonal
Lag Bolt
Bracket
3/8" Diagonal
Lag Bolt
Screw
Figure 4
Figure 5
0521 IH-6517