Setting Up The Work Piece - Timken VHIN 10 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 45
5.
WARNING!
• Use appropriate hoisting equipment for heavy components
and yokes. The manual lifting of heavy objects is a common
cause of injury.
• The weight of the work-piece should not exceed the maxi-
mum weight shown in section 5.2 below, and in the techni-
cal data (Appendix 1) at the back of the manual. Exceeding
these limits may result in catastrophic equipment failure
leading to personal injury.
• Ifheaterisequippedwithslidinghorizontalsupports,always
secure these with the designated safety pin, in either the
'in' or the 'out' position. Unexpected movement of the work
piece may lead to personal injury.
• Ensure that the mains cable cannot come into contact with
the work piece. Damage to the cable may result in electro-
cution.
• Never support components with a metal cable or have any
hanging in the proximity of the magnetic field. Extremely
high currents can flow through the cable causing it to heat
up quickly, resulting in a risk of burning.
The work piece can be set up in two different ways:
Yoke passing through the work piece
noticeheaterGB.indd 11

Setting up the Work Piece

11
Yoke in the horizontal position
(The bore is large enough for the pole to pass
through it. The work piece in this example is
shown resting on the horizontal supports).
GB
17/10/06 15:16:58

Publicidad

Tabla de contenido
loading

Tabla de contenido