Concrete
Consult your concrete/waterproofing supplier for any waterproofing and application method.
Junction box
Item no. 12310
Cable tube
Item no. 12330
Install as below:
1. C onnect the cable (min. 6mm
Use the supplied grounding kit with a screw, ring cable and tag plate.
2. F ix the inlet pipe, mask the flange (its surface should be under the packing).
Stones: The flange should rest on the finished pool wall (see fig. A on the prev. page).
Insulating block: The flange should rest on the pool wall plastered finish (see fig. B on the prev. page).
Concrete: The flange should rest on the pool wall plastered finish (see fig. C on the prev. page).
NOTE! The minimum distance between non-corrosive and corrosive materials shall be 50 mm.
Recommended mounting depth, see drawing.
3. Cast the pool frame as instructed by the supplier.
4. Fix self-adhesive packing onto flange.
5. Fit the plug to the rear of the injection pipe. If o-ring is used, no other seal is required.
6. Fit the cable duct (or cable pipe art. no.12330) into the plug. Use the supplied o-ring and ensure that
it fits right. No additional seal required.
7. Fit the pool matter according to the supplier's instructions and start water filling.
8. When water reaches around 5 cm below the injection pipe, cut a small cross in the liner in the hole
center. Fit the packing and seal with 6 screws.
9. Trim the liner below the sealing inside edge.
10. Pull the cable through the cable screw/pipe and pull it out onto the front of injection pipe.
Pull out enough cable (max 1m) to later lift the lamp above the water surface.
This will facilitate future changes or winter shutdown.
11. If cable duct is used connect it to the coupling box by the cable screw. Coupling box art. no 12310 from Pahlén can be used.
12. Pull the sealing sleeve onto the cable. The sealing sleeve should be placed in the rubber on the cable screw.
13. Tighten the cable screw so that the cable is firmly fixed.
14. Insert the LED module cable into injection pipe and clamp the LED module on the front panel. Tighten it with two screws.
15. Fill the pool with water to the desired level.
126
) from the inlet pipe flanges to the earth point.
2
Concrete
C
16
ENGLISH
Wall mat
Plaster
Liner
UP
Flange
UP
Sealing ring

Publicidad

Tabla de contenido
loading

Tabla de contenido