Installing Strike Plate And Box; Physical Testing - ZKTeco ML200 Serie Guia De Instalacion

Ocultar thumbs Ver también para ML200 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installing Strike Plate and Box

8
Make sure that the Strike Box is aligned with the Latch bolt. Then, use the Installation
1)
Template to drill holes.
2)
Align the Strike Plate and Box with the drilled holes and fix them with Screw A.
12mm

Physical Testing

9
A.
Test the lock by rotating the handle.
Note: When the door is locked, the front handle can be turned, but the door will remain
locked.
B.
Test the lock by using the mechanical key.
Insert the Key into key hole and rotate 90°, then rotate down the handle to open the door.
2mm
(5/64")
depth
(15/32")
depth
21mm
(53/64")
35mm
(35/64")
(1-3/8")
Screws A
8

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ml300 serie

Tabla de contenido