Preparing The Installation; Installing Components - Waeco DC-Kit3 Instrucciones De Montaje Y De Uso

Set de ampliación para cc
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53
DC-Kit3.book Seite 29 Freitag, 13. Juni 2008 3:24 15
DC-Kit3
7.1

Preparing the installation

➤ Disconnect the following voltage supplies in the vehicle:
– Positive battery terminal
– External voltage supply
7.2

Installing components

➤ Install the ECL-102 charging current distributor.
➤ Install the MSK1500-012 inverter.
➤ Install the MCR9 remote control.
➤ Install the VS-230-2 priority circuit.
e
Danger of electrocution
Only connect the battery once you have the completed all the in-
stallation work and you are certain it has been done properly.
7.3
Connecting the CA1000 Dometic roof air
conditioner
➤ Remove the air outlet of the roof air conditioner (
page 3).
➤ Insert the on/off cable for CA1000 into the socket on the control board of
the roof air conditioner (fig. 2 1, page 3).
➤ Lay the on/off cable of the roof air conditioner to the ECL-102 charging
current distributor.
➤ Connect the on/off cable with connections I2 and I3 of the charging
currentdistributor (
➤ Attach the air outlet of the roof air conditioner (
page 3).
7.4
Connecting the CA2500 Dometic roof air
conditioner
➤ Remove the air outlet of the roof air conditioner (
page 4).
➤ Cut the cable loop of the CA2500 on/off cable through the middle
(fig. 5 A, page 4).
➤ Connect the control cable to the on/off cable (fig. 5 B, page 4).
Installing and connecting the DC kit
ECL-102) (fig. 3 1 and 2, page 4).
CA1000) (fig. 1,
CA1000) (fig. 1,
CA2500) (fig. 4,
29

Publicidad

Tabla de contenido
loading

Tabla de contenido