Functional Parts Of Your Combind 500E; Unpacking And Installing The Unit; Installing And Connecting The Unit - LEITZ comBIND 500e Instrucciones

Ocultar thumbs Ver también para comBIND 500e:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29

Functional parts of your comBIND 500e

Mains cable/plug – Connect to a properly-
 
earthed mains socket.
On/Off switch (I/O) – Switch unit on and off. To
B 
save energy, always switch off the unit after use.
Blow-out fuse – Safeguard against electrical
 
malfunction. Only replace with same type and
rating.
Lid/paper stand – When opened, the lid acts as 
D 
a paper stand to ease punching.
Adjustable paper stop – Set to the paper format
E 
used: A4, US letter or A5.
Front slot for two-hole punching – Place
F 
sheets here for standard two-hole punching.
Rear slot for punching (21 holes) – Place
G 
sheets here to punch for binding with plastic
combs.
1
2
6
Punching depth switch – Set to the comb
H 
diameter used. With the correct punching depth 
set, your sheets will turn with ease.
Punching button – Press to punch sheets placed
I 
in the front or rear punching slots.
Binding mechanism – Opens and closes the
J 
plastic combs with help of the binding lever
Comb size scale – Shows the comb size needed
K 
for the amount of sheets to be bound.
Binding lever – Used to open and close
L 
the plastic comb inserted into the binding
mechanism
Cuttings tray – Empty regularly to avoid damage
M 
to the motor and punching dies.

Unpacking and installing the unit

1. Unpacking / scope of supply
• Carefully unpack the unit and inspect it for damage.
Warning! Risk of electrical shock. Do not connect to the mains
supply if there is any damage to the unit (loose parts, broken 
chassis, defective or wrong mains cable etc.) or if the local mains 
voltage does not match the rating indicated on the type plate.
• The packaging should contain the following items:
– the comBIND 500e,
–  a starter set (choice of plastic combs and front/rear covers),
– this operation manual.
• Keep the packaging material at least until the guarantee has
expired.

2. Installing and connecting the unit

• Place the unit on a stable, level surface (e. g. table) near a mains
outlet.
• Connect the mains cable
accidents (such as tripping over the cable).
• Fold back the lid (paper stand) 
• Press the power switch
The punching dies were coated with protecting oil during manufacture.
• Punch several sheets of scrap paper in order to clean the
punching dies.
The unit is now ready for operation.
.
J
with the mains outlet in a way to avoid
.
D
to switch the unit on.
B
.
L

Publicidad

Tabla de contenido
loading

Tabla de contenido