Descargar Imprimir esta página

Publicidad

Enlaces rápidos

5
PCE
5pce Pipe Threading Kit
Coffret de filières de
plombier, 5 pcs
Gewindeschneidkluppe,
5-tlg. Satz
Fig I
Fig III
Product Familiarisation
Specification
1.
Ratchet Head
Winder action: ................................................Ratchet
2.
Handle
Dies: ..........................................½", ¾", 1" and 1-¼"
3.
Handle Extension
Weight: ............................................................4.28kg
4.
½" Die
As part of our ongoing product development,
specifications of Silverline products may alter
5.
¾" Die
without notice.
6.
1" Die
7.
1-¼" Die
8.
Blow Moulded Case
9.
Ratchet Direction Knob
General Safety
WARNING: Read all safety warnings and all instructions. Failure to follow the warnings and
instructions may result in a serious injury.
This tool is not intended for use by persons (including children) with reduced, physical
or mental capabilities or lack of experience or knowledge unless they have been given
supervision or instruction concerning use of the tool by a person responsible for their safety.
Keep children and bystanders away while operating or using this tool.
" B S P T
-
1
" , 1 " & 1
4
" ,
3
1
4
2
Juego de terrajas para
tubos, 5 pzas
Kit di filiere per tubi 5 p.zi
5-delige pijpdraad
snijder set
Fig II
Personal safety
a) Stay alert, watch what you are doing and use common sense when operating or using
this tool. Do not operate or use the tool while you are tired or under the influence of drugs,
alcohol or medication
b) Use personal protective equipment. Always wear eye protection.
Before Use
IMPORTANT: Ensure there is sufficient thread cutting oil (not supplied) readily available before
threading any pipes. Have the oil close by during the threading operation.
Handle assembly
1. Take the Handle (2) and screw into the Handle Extension (3)
2. With the Handle and Handle Extension assembled, screw into the Ratchet Head (1)
3. Ensure the Handle is screwed in tightly before use
Operation
1. Choose the correct size Cutting Die (4–7) for the pipe required. The pipe width should be the same
size as the insertion end of the Die (Fig I). Check by inserting the pipe into the insertion
end of the Die
5
4
Fig IV
2. Secure the pipe in a vice
3. Insert the chosen Die into the Ratchet Head (1) (Fig II)
4. Insert the pipe into the insertion end of the Die (Fig III)
5. Use thread cutting oil thoroughly on the pipe and the Die's cutters
6. Apply pressure to the Die on the end of the pipe and use the Handle (2) to rotate the Ratchet Head
around the pipe to engage the Die's cutters with the pipe end (Fig IV)
7. Move the Handle to use the ratcheting action of the cutting head before threading more of the
pipe. Continue this operation until the desired amount of thread on the pipe is achieved
8. Pull out the Ratchet Direction Knob (9) and change the ratcheting direction by turning it 180° until
the arrow points in the opposite direction, which will disengage the Die when the Handle is used to
rotate the Ratchet Head
9. Use the Handle to rotate the Ratchet Head until the Die is fully disengaged from the end of the pipe
10. Be careful not to damage the new threads when removing the Die from the pipe end
WARNING: The swarf from the threading process may contain sharp shards of metal! Be careful
when cleaning the pipe end and use protective equipment to prevent cuts and other injuries.
6
3
2
8
Version date: 02.12.2016
www.silverlinetools.com
868556
7
1
9

Publicidad

loading

Resumen de contenidos para Silverline 868556

  • Página 1 Die’s cutters with the pipe end (Fig IV) Before Use specifications of Silverline products may alter ¾" Die 7. Move the Handle to use the ratcheting action of the cutting head before threading more of the without notice.
  • Página 2 8. Tirare il pomello direzionale del cricchetto (9) e cambiare la direzione di cricchetto girandolo 180° Prima dell’uso le specifiche dei prodotti Silverline possono variare fino a rgagiungere le punte a dardo sulla parte opposta, disimpegnando così la filiera quando il senza preavviso.