6. Commissioning, operation
6.2 Making the electrical connection
The instrument must be earthed via the process connection.
■
The power supply for the temperature switch must be made via an energy-limited electrical circuit in
■
EN
accordance with section 9.3 of UL/EN/IEC 61010-1 or an LPS to UL/EN/IEC 60950-1 or class 2 in
accordance with UL1310/UL1585 (NEC or CEC).
The power supply must be suitable for operation above 2,000 m should the temperature switch be
■
used at this altitude.
For cable outlets, make sure that no moisture enters at the cable end.
■
Connection diagramms
Circular connector M12 x 1, 4-pin
Assignment
U+
U-
1
3
20
S+
SP1 / C
SP2
2
4
2
Circular connector M12 x 1, 5-pin
Assignment
U+
U-
1
3
WIKA operating instructions temperature switch, model TSD-30
S+
SP1 / C
SP2
5
4
2