Position the pressure chamber
in the holder. Connect the
transducer to the pump by
firmly screwing it in clockwise.
Press the Fill chamber pad
several times until the chamber
is 1/3 full. The green LED blinks
until pad is pressed.
Close the cover.
Warning:
It is mandatory that the pressure chamber remains vertical
during the procedure and that the pump be positioned at the
same level as the patient.
19
Green LED blinks. Press Run/
Stop. The green LED blinks
initially, then remains on.