Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2
Use the proper diagram below, for placement of ductwork
and electrical cutout in cabinet or wall.
HOOD MOUNTING SCREWS (4)
15 /
13
"
(30" hood)
16
15 /
16
"
(36" hood)
16
CABINET FRONT
CABINET
BOTTOM
7 /
6
"
8
6¼"
5 /
10
"
VERTICAL DUCT
8
ACCESS HOLE
WOOD SHIMS
CENTER
(recessed-bottom
cabinets only)
WOOD SHIMS
(recessed-bottom
cabinets only)
CABINET FRONT
HORIZONTAL DUCT
7 /
3
"
8
ACCESS HOLE
CABINET
BOTTOM
6¼"
15 /
13
"
(30" hood)
16
15 /
16
"
(36" hood)
16
HOOD
MOUNTING
CENTER
SCREWS (4)
3¼" X 10"
Vertical ducting
15 /
13
"
(30" hood)
16
15 /
16
"
16
(36" hood)
1 /
7
"
2
6¼"
7 /
9
"
8
ELECTRICAL
ACCESS HOLE
(in cabinet bottom)
LINE
3¼" X 10"
Horizontal ducting
3 /
"
4
1 /
"
8
6¼"
1 /
7
"
2
15 /
13
"
(30" hood)
16
15 /
16
"
(36" hood)
16
ELECTRICAL
ACCESS HOLE
LINE
(in wall)

prepare tHe Hood

1 /
1
"
4
9"
WIRING
COVER
3
Remove the aluminum Filters, Bottom cover, and
wiring cover from the hood.
HORIzONTAL DISCHARGE POSITION
4
Blower is shipped in Vertical discharge position.
To change blower to Horizontal discharge position:
Remove Knurled nuts from Blower mounting rods.
Disengage mounting rods from blower and rotate blower
to horizontal discharge position. Re-engage mounting
rods and tighten blower in place with knurled nuts.
model nsp130
BOTTOM
COVER
ALUMINUM
FILTERS
VERTICAL DISCHARGE POSITION
BLOWER
KNURLED NUT (2)
BLOWER
KNURLED NUT (2)
Page 
BLOWER
MOUNTING
ROD (2)
BLOWER
MOUNTING
ROD (2)

Publicidad

Tabla de contenido
loading

Tabla de contenido